In a letter written to the ministries earlier this month, APP said the entire upto 100 mm sized coal production by surface miners should be dispatched through direct rail mode from South Eastern Coalfields Ltd’s (SECL) own sidings and merry-go-round train (MGR), or conveyor belt.